The usual thing - the project manager wants to issue the drawing before the design has been done.
I cannot get the CSO to work AND pass the right flow to the WwTW. Today's attempt will probably involve a complete redesign of the inlet works configuration, feeding the storm tank from the CSO rather than a local storm weir. All the drawings that are being presented to the HAZOP and ALM meetings tomorrow will therefore be wrong.
Heigh Ho.