My project to report for the XYZ site has now been knocked back three times by my reviewer. He accepts that I have dealt with everything that the client wants, but he now wants me to tresh out a side issue that I have discovered. it is a UV plant with three channels that are supposed to carry the same flow but I have found records showing up to 780% variation between them. The sure staff deny that there is any sensor present to measure this, and yet the record is there so something must be measuring it. And a variation greater than 10% falls outside of the specification.
Personally I think that these are momentary blips that we should ignore, but the boss seems determined to overspend the budget investigating them.
No comments:
Post a Comment